x
This website uses cookies. By continuing to browse our website you consent to the use of cookies. Learn more
Language Selection
PTEN

BOSCH Factory

local: Braga
Cliente: BOSCH
Data: 2008
Descrição Geral:

The BOSCH industrial unit existing and at work in Braga is a reference unit for the group, both at the level of production, and at the level of logistics. This industrial unit comprises big production and storage warehouses and works 24/24 hours. The AZ76 intervention in BOSCH the industrial unit, in Braga, was made at the level of the project for automatic extinguishing system by sprinklers. This project comprised the whole sprinklers`s network on the ceiling and shelves, as well as the pumping station. There were some important premises which had to be respected, such as the fact that the whole system was installed with the unit functioning.

 

 

voltar
© 2024 AZ
76
Consultores de Investimentos e Engenharia Lda